Valentine's Day Sale Now On! 10% OFF for Selected Products

Free Shipping on Orders Over $150*

HB175 C - Egg Incubator - Setter & Hatcher

SKU: HB175C
  • Double Door = Easy Cleaning
  • Automatic & Self-Regulated Temperature and Humidity for Professional Hatching
  • Low Cost, Energy Efficient = You Save $ Every Hatch

Free Ground Shipping Over $150

30 Day Returns - Learn More

1 Year Warranty - Learn More

$1,917.99

Description

Embark on a journey of incubation excellence with the Cimuka HB175C, a state-of-the-art cabinet egg incubator, first of its kind in the market with its patented, energy-efficient design. This automatic cabinet incubator is more than just a quail egg incubator or incubator for chicken eggs; it's a revolutionary path to achieving higher hatch rates with unparalleled ease and automation. Best for hatcheries, small poultry operations, homesteads, farms, poultry enthusiasts and more. NOTE: Hatcher sold separately*

Humisonic TM Humidity Control: Ensuring precise humidity control, the HB175C's HumisonicTM System maintains the internal humidity according to your set parameters. Simple to use, just add water to the tank above, and for additional support, fill the internal bottom pan with water as needed.

AirRoute TM Ventilation System: The HB175C is equipped with the AirRoute TM ventilation fan system, which is IP55 certified and uses minimal energy. This advanced system offers protection from voltage fluctuations and first-class defense against dust and humidity. You can rest assured that your incubator will maintain consistent temperature and humidity throughout.

TurnX TM Egg Turners - Vibration-Free and Energy-Efficient: The incubator boasts TurnX TM egg turners, reducing stress on your eggs with their vibration-free operation. These precisely calibrated turners turn a full 45 degrees each side, ensuring high hatch rates while using minimal energy, thereby saving you money.

Innovative Active Periodic Cooling (APC): The HB175C features the groundbreaking Active Periodic Cooling technology, a first in the market. Mimicking the natural incubation process where birds leave the nest, allowing eggs to cool and release moisture, APC adjusts the temperature and humidity within the incubator to replicate this natural cooling and dehumidifying process. This unique feature is especially crucial for hatching goose eggs, significantly increasing hatch rates.

Advanced Alarm System for Monitoring: The HB175C features two advanced alarms for high/low temperature and high/low humidity, each with a room sensor. These alarms enable you to monitor both the internal and external conditions, ensuring optimal incubation conditions at all times. You can ditch your hygrometer and thermometer with our self-regulated egg incubators.

Versatile Capacity for Various Bird Eggs: The HB175C is exceptionally versatile, accommodating a wide range of poultry eggs. Enjoy "Batch Hatching" - this model can hatch up to 99 quail eggs, 56 partridge eggs, 48 pheasant eggs, 35 chicken eggs, 24 turkey eggs, 24 duck eggs, 15 goose eggs, and 15 peacock eggs every few days depending on breed. Simply move eggs down a level every few days.

Adjustable Egg Setter Trays: With 4 adjustable egg setter trays accommodating a variety of egg sizes, the HB175C is perfect for a wide range of poultry breeding eggs, including quail, chicken, peacock, and more. Its large capacity of up to 175 chicken eggs and adaptable tray dividers make it an ideal incubator for those who require versatility in their hatching endeavors.

User-Friendly and Maintenance-Friendly: Designed for easy maintenance, the HB175C offers front and back access, simplifying cleaning and upkeep. This feature, along with its user-friendly interface, makes the incubator approachable and easy to use, even for those new to incubation.

Patented Low-Energy Design for Cost-Effective Operation: Embrace the cost-saving benefits of the HB175C's patented technology, designed for low energy consumption without compromising on performance.

Ideal Location and Power Usage: Recommended for use indoors in a draft-free room, preferably a temperature-controlled room. Avoid direct sunlight if possible. The HB175C operates on 110 V / 60 HZ, with an average energy consumption of 75 W and a maximum wattage of 230 W. Its dimensions are L 22” x W 21” x H 49”, fitting perfectly in any indoor setting.

*If you plan to use the setter racks as hatching baskets for larger capacity hatches, tray covers need to be purchased. Tray cover (SKU: FLX35Y-K) fits on egg setter trays when dividers are removed.

Specifications

Brand: Cimuka

Model: HB175C

Material: Insulated Walls: ABS Plastic - Frame: Anodized Aluminum

EAN: 8682258010349

Assembly Required: Minimal

Recommended Location: Indoors, preferably a temperature-controlled room

Voltage: 110 V / 60 HZ

Average Energy Consumption:75 W

Max Wattage: 230 W

_

Dimensions & Weight

Unit: L (22 in) x W (21 in) x H (49 in)

Box: L (25 in) x W (21 in) x H (41 in)

Cabinet Size: L (19.5 in) x W (17.5 in) x H (36 in)

Weight: 62 lb

Product Support

User Manual: View

Warranty: View

_

Questions? Contact Us

Technology

Active Periodic Cooling (First in the market)
Most birds leave the nest, at least once, during incubation. During this time, the eggs cool down and release moisture. Active Periodic Cooling (APC) changes the temperature and humidity within the incubator to reenact the cooling and dehumidifying process that eggs would receive naturally from the mother bird leaving the nest. This unique addition to our incubators increases hatch rates. This is extremely important if you hatch goose eggs! 

Egg Turners: TurnX TM
Reduce stress on your eggs with vibration-free egg turners. These calibrated turners ensure high hatch rates and use minimal energy - saving you money! 

Ventilation: AirRoute TM
Our AirRoute TM ventilation system is IP55 certified and uses minimal energy.  The system protects you from voltage changes and offers a first in class protection from dust and humidity. You can rest assure that your system will maintain the same temperature and humidity throughout the whole cabinet.

Humidity: Humisonic TM
HB incubators always keep the internal temperature and humidity to your set parameters. Our HumisonicTM System provides humidity to the incubator when necessary. Just add water to the tank up top! Also, don't forget to fill your bottom pan with water for additional support - as needed.

Alarm(s)
HB incubators offer 2 alarms:

- High / Low Temperature Alarm (Plus room sensor)
- High / Low Humidity Alarm (Plus room sensor)

Capacity

____

Quail: Set 396, Hatch 99

Partridge: Set 224, Hatch 56

Pheasant: Set 192, Hatch 48

Chicken: Set 140, Hatch 35

Turkey: Set 96, Hatch 24

Duck: Set 96, Hatch 24

Goose: Set 60, Hatch 15

Peacock: Set 60, Hatch 15

____

This incubator can set eggs in the racks above and hatch eggs in the basket below.

Need to hatch more at once? You can convert the upper setter trays to hatching baskets by removing the separators and purchasing Setter Tray Covers FLEXY35Y.

View All Models

Featured on Social!

  • Hatching Time CImuka. CT Incubator can be seen in room. Digital control can be seen on top of incubator. Humisonic humidifier can be seen on side of incubator.

    @countrycrittersfarm

  • Hatching Time Cimuka. Hatching baskets can be seen in CT series incubator.

Frequently Asked Questions

What voltage is it?

110V/60Hz

Can it be powered via solar?

Our incubators cannot be powered via solar.

How does the incubator turn my eggs?

With our HB models, the setter trays are placed in an anodized aluminum frame. The frame will turn 45 degrees in each direction, slowly, over the course of one hour. Even with the tilt of the frame, your eggs are safe to set and will not fall out of the tray.

Reviews

Hatching Time Shop All Products

Need Help?

We are in the office Monday through Friday.

9AM - 6PM (EST)