November Sale is on! SHOP NOW

FREE Shipping over $150*

0% Financing, Up to 6 Months: Learn More

HB350 H - Fully Automatic Egg Hatcher

SKU: HB350H
  • Double Door = Easy Cleaning
  • Automatic & Self-Regulated Temperature and Humidity for Professionals
  • Low Cost, Energy Efficient = You Save $ Every Hatch

Freight Shipping Calculated at Checkout

30 Day Returns - Learn More

1 Year Warranty - Learn More

$1,499.99

Description


Embark on a journey of incubation excellence with the Cimuka HB350H, a state-of-the-art cabinet egg hatcher, first of its kind in the market with its patented, energy-efficient design. This automatic cabinet egg hatcher is more than just a quail egg incubator or incubator for chicken eggs; it's a revolutionary path to achieving higher hatch rates with unparalleled ease and automation. Best for hatcheries, small poultry operations, homesteads, farms, poultry enthusiasts and more.

NOTE: Setter sold separately. This unit comes with 4 hatching basket lids. If you are hatching smaller birds, you may need to purchase additional lids*

Humisonic TM Humidity Control: Ensuring precise humidity control, the HB350H's HumisonicTM System maintains the internal humidity according to your set parameters. Simple to use, just add water to the tank above, and for additional support, fill the internal bottom pan with water as needed.

AirRoute TM Ventilation System: The HB350H is equipped with the AirRoute TM ventilation fan system, which is IP55 certified and uses minimal energy. This advanced system offers protection from voltage fluctuations and first-class defense against dust and humidity. You can rest assured that your incubator will maintain consistent temperature and humidity during hatching.

Advanced Alarm System for Monitoring: The HB350H features two advanced alarms for high/low temperature and high/low humidity, each with a room sensor. These alarms enable you to monitor both the internal and external conditions, ensuring optimal incubation conditions at all times. You can ditch your hygrometer and thermometer with our self-regulated egg incubators.

Versatile Capacity for Various Bird Eggs: The HB350H is exceptionally versatile, accommodating a wide range of poultry eggs. This model can hatch up to 990 quail eggs, 560 partridge eggs, 480 pheasant eggs, 350 chicken eggs, 240 turkey eggs, 240 duck eggs, 150 goose eggs, and 150 peacock eggs. Purchase setter separately*

User-Friendly and Maintenance-Friendly: Designed for easy maintenance, the HB350H offers front and back access, simplifying cleaning and upkeep. This feature, along with its user-friendly interface, makes the incubator approachable and easy to use, even for those new to incubation.

Patented Low-Energy Design for Cost-Effective Operation: Embrace the cost-saving benefits of the HB350H's patented technology, designed for low energy consumption without compromising on performance.

Ideal Location and Power Usage: Recommended for use indoors in a draft-free room, preferably a temperature-controlled room. Avoid direct sunlight if possible. The HB175H operates on 110 V / 60 HZ, with an average energy consumption of 85 W and a maximum wattage of 270 W. Its dimensions are L 32” x W 21” x H 49”, fitting perfectly in any indoor setting.

Specifications

Brand: Cimuka

Material: - Insulated Walls: ABS Plastic - Frame: Anodized Aluminum

Assembly Required: Minimal

Recommended Location: Indoors, preferably a temperature-controlled room

Voltage: 110 V / 60 Hz

Average Energy Consumption:85 W

Max Wattage: 270 W

_

Dimensions & Weight

Unit: L (32 in) x W (21 in) x H (49 in)

Box: L (35 in) x W (21 in) x H (44 in)

Cabinet Size: L (30 in) x W (17 in) x H (36 in)

Weight: 69 lb

Product Support

User Manual: View

Warranty: View

_

Questions? Contact Us

Technology

Ventilation: AirRoute TM
Our AirRoute TM ventilation system is IP55 certified and uses minimal energy.  The system protects you from voltage changes and offers a first in class protection from dust and humidity. You can rest assure that your system will maintain the same temperature and humidity throughout the whole cabinet.

Humidity: Humisonic TM
HB incubators always keep the internal temperature and humidity to your set parameters. Our HumisonicTM System provides humidity to the incubator when necessary. Just add water to the tank up top! Also, don't forget to fill your bottom pan with water for additional support - as needed.

Alarm(s)
HB incubators offer 2 alarms:

- High / Low Temperature Alarm (Plus room sensor)
- High / Low Humidity Alarm (Plus room sensor)

Capacity

____

Quail: 990

Partridge: 560

Pheasant: 480

Chicken: 350

Turkey: 240

Duck: 240

Goose: 150

Peacock: 150

____

Need an incubator to set your eggs before hatching? We offer Setter Only (S) Models that can be converted to a Hatcher (H). Alternatively, you can purchase Combined (C) Models. NOTE: You cannot convert a Hatcher (H) to a Setter (S).

View All Models

Featured on Social!

  • Hatching Time Cimuka. 4 HB incubators can be seen side by side in a room in image.

    Faithful Feathers Poultry

  • Hatching Time Cimuka. Egg can be seen inside HB series incubator in hatching baskets.

    Phimnyujvaim Heev

  • Hatching Time Cimuka. HB incubators can be seen sidy by side. The incubator on the left is a hatcher, the incubator on the right is a setter. Both incubators have digital controls on top connected to humisonic humidity system.
  • Hatching Time Cimuka. Hatching baskets can be seen inside HB incubator racks filled with various colored eggs.

    Faithful Feathers Poultry

Customer Review Video

Hatching Time industrial cabinet egg incubators main image

Product Support

Frequently Asked Questions About HB350 H - Fully Automatic Egg Hatcher

How many chicken eggs can the HB350 H hatch?

The HB350 H can hatch up to 350 chicken eggs. Capacity changes with other poultry egg sizes.

Is the HB350 H a hatcher-only model?

Yes. It is built for the final hatching stage. Eggs must be set and incubated beforehand in a separate setter or incubator.

Does the HB350 H turn eggs?

No. Eggs are not turned during the final hatching stage, so the hatcher does not need the setter-style turning system.

How does the HB350 H control hatching conditions?

It automatically regulates temperature and humidity and uses Humisonic humidity control, AirRoute ventilation, and high/low alarms.

What power supply and placement does the HB350 H require?

It runs on 110V / 60Hz power and is intended for indoor use, preferably in a draft-free, temperature-controlled room.

Reviews

  • 5 stars: 4 (100%)
  • 4 stars: 0 (0%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
A
Aurora G.
Everyone keeps asking where I got it.

Great product for both beginners and experienced poultry keepers.

Thank you for the review. We strive to create products that are user-friendly for both beginners and experienced poultry keepers. Happy hatching - THe Hatching Time Team

M
Matthew
best quality for the money

The incubator is built vary well has rubber gaskets for doors with bright light nice touch, has 1gal tank on top, big fan push lot of air around all, electronics that sensitive is outside and easy to work on and clean, I recommend there Products, what you spend is what you get.

Thank you for the review and recommendation - The Hatching Time Team

M
M.S.
Great Hatcher!

I've already hatched 300+ quail and some Indio Gigante and Spitzhauben chickens. Soon I'll be moving Turkey, Peafowl and Duck eggs in there. easy setup and runs flawlessly.

Thank you for the review. We're proud to bring you the most technologically advanced poultry farming equipment on the market. - The Hatching Time Team

S
S.F.

👍🏻

S
Stacylee J.

Can I order this Hatcher it says sold out can I order one for may 8

Hatching Time

HB350 H are a popular model. New stock arriving week of May 8th. To Pre--order please call (800)-511- Monday - Friday *(10 am - 6pm ET)

Hatching Time Shop All Products

Need Help?

We are in the office Monday through Friday.

9AM - 6PM (EST)